← Bhaskar Engineer
House & Villa Design

An architect for the house you're actually going to build

Most people come to us at one of three moments: they have just bought a plot and don't know what it can hold, they have drawings from someone else that don't feel right, or a contractor has quoted a number and they want to know whether it is sane.

All three are good moments to call. The expensive mistakes in a house are made in the first six weeks, before anyone breaks ground — the wrong orientation, a staircase in the wrong place, a plan that quietly wastes fifteen percent of your FSI. Once footings are cast, those become permanent.

Feasibility and plot study

Before any design, what your plot legally permits: FSI, setbacks, height limits, ground coverage, access, and the local development control rules that apply. This alone often changes what people build.

Concept design

Plans, elevations and 3D views — enough to see the house clearly and change your mind cheaply. Three to four weeks.

Design development

Materials, sections, and the details that separate a house that photographs well from one that lives well: light, cross-ventilation, storage, service access, where the AC outdoor units hide. Four to six weeks.

Working drawings

The set your contractor actually builds from — dimensioned plans, sections, details, electrical and plumbing layouts, joinery. Six to eight weeks. This is where design-only architects go thin, and where sites go wrong.

Approvals and site

Drawings for municipal submission, and site visits at the milestones that matter — layout marking, plinth, slab, first fix, finishes.

Selected Work
Questions

Yes, and it is the best time to start.

Have a plot, or drawings you're not sure about?

Send it across and I'll come back with an honest read on what it can hold and what it will take — whether or not we end up working together.